Design to build, one team

Our Process.

Pools, patios, walls, and whole yards, each followed from the first drawing to the finished build.

Scroll to explore

How it works

Four steps.
One team.

From the first measured drawing to the finished yard. Every step below is the same real project: a rectangle pool with a spa at one end, a fenced paver deck, and a pool house in the corner.

Keep scrolling down. The steps slide in from the right.

2D site plan of a rectangle pool with a spa and a pool house

2D plan

01 / 04

We walk the property and take stock of grade, drainage, and sun, then draw a measured, to-scale site plan: the pool, the deck, the beds, every dimension settled on paper first.

3D sketch of the pool, spa, fenced paver deck, and pool house

3D sketch

02 / 04

The plan sketched out in 3D. You walk through your yard on a screen, see the deck shape, the paver color, and the planting together, and change what you want before anything is priced.

Final 3D design of the same pool, spa, and pool house, with the lighting placed

3D final

03 / 04

The finished design, every material, plant, and light settled. This is the version you approve, and the one we build to.

The finished pool, spa, paver deck, and pool house

The build

04 / 04

The same team that drew it builds it, then walks it with you against the 3D final. No handoff between a designer's file and a builder's truck.

That’s the process.

Keep scrolling for another project ↓

Scroll down to move through the process →

Project 02

Same four steps.
Another yard.

A lap-length pool, a wide paver deck, and a putting green set into the lawn below it. Plan, sketch, final, and the build, shown the same way.

Keep scrolling down. The steps slide in from the right.

2D site plan of a rectangle pool, paver deck, and putting green

2D plan

01 / 04

A measured, to-scale site plan: the pool, the deck, the beds and every dimension, drawn before anything else gets decided.

3D sketch of the rectangle pool, paver deck, and putting green

3D sketch

02 / 04

The plan sketched out in 3D: the paver color, the deck shape, the planting, the green. You walk through it and change what you want before anything is priced.

Final 3D design of the same pool and putting green, with the landscape lighting placed

3D final

03 / 04

The finished design, every material, plant, and light settled. This is the version you approve, and the one we build to.

The finished pool, paver deck, and putting green

The build

04 / 04

What we built: the same pool, the same paver deck, the same putting green.

Yours could be next.

Keep scrolling to start yours ↓

Scroll down to move through the process →

What to expect

What you do. What we handle.

Free

First visit and consultation

2–6 wks

Permits, depending on the township

4–12 wks

Build, from dig day, depending on the project

01

2D plan

You

Walk the yard with us and tell us how you want to use it.

We

Measure grade, drainage, and sun, and draw the plan to scale.

02

3D sketch

You

Walk through it on a screen. Change anything you want.

We

Rework it until it's right, then put a real number on it.

03

3D final

You

Approve the design. Sign the permit application as the owner.

We

Prepare the drawings, file with the township and any HOA, and schedule the dig.

04

The build

You

Watch it come together, then walk the finished yard with us.

We

One crew from excavation to planting, checked against the 3D final.

Questions we get

How long does a project take?+

It depends on the project. Most builds run 4 to 12 weeks from dig day, with a plain pool at the short end and a full backyard of decks, walls, and planting at the long end. Permits come first and take two to six weeks, depending on the township.

What does the first visit cost?+

Nothing. We walk the property with you, confirm it's in our service area, and talk through what you want. First consultations are free.

Can I change the design after I see it in 3D?+

Yes. That's what the 3D sketch is for. Move the pool, swap the paver color, rework the planting, and see it again before anything is priced. The 3D final is the version you approve, and the one we build to.

Do you handle permits?+

Yes. As the property owner you sign the application, but we prepare the site plans and specifications, file with the township, and handle any HOA review. Approvals take two to six weeks, depending on the township.

When should we start?+

Design in fall or winter, dig in spring. Permits and material orders take time, and a wet Western PA spring can push excavation. A late-summer start usually finishes after swim season.

Ready to see your yard in 3D?

Scope it with the project planner or call us directly. First consultations are free.

Or see more of our work →
Illuminated stone waterfall wall over an inground pool at dusk

The flagship work

The yard around the pool is the project.

Pool, deck, walls, and planting designed together and built by one crew. See what that looks like finished.